  1. #006

    2026-11-12

    MIGRATION

    Still running Siemens S5? Your migration options explained

    Siemens S5 has been obsolete since 2005. The risks of staying on S5, the three realistic migration paths to S7 and TIA Portal, and how to plan a low-downtime change-over.

    2 min read
  2. #005

    2026-11-05

    DRIVES

    DC to AC drive conversion: when does it make sense?

    Converting DC drives to AC can save 40–50% in energy. How AC vector drives match DC performance, when to convert, and when to upgrade the DC drive instead.

    2 min read
  3. #004

    2024-06-14

    MIGRATION

    Migrating from SIMATIC S7-300/S7-400 to S7-1500 and TIA Portal: A Practical Guide

    Why and how to migrate Siemens S7-300 and S7-400 PLCs to S7-1500 and TIA Portal — preparation, the migration process step by step, and what to do afterwards.

    3 min read
  4. #003

    2023-10-16

    MIGRATION

    It's the end of an era: the SIMATIC S7-300 phase-out

    Siemens has started phasing out the SIMATIC S7-300 and ET 200M. What the phase-out means for your plant, the key dates, and how to plan your move to S7-1500.

    2 min read
  5. #002

    2021-11-20

    RETROFIT

    10 benefits of retrofitting the automation system on an existing machine

    Why upgrading the controls and drives of an existing machine is often smarter than buying new — cost, lead time, technology, reliability and more.

    2 min read
  6. #001

    2021-07-08

    INDUSTRY 4.0

    7 benefits of Industry 4.0 for manufacturers

    What Industry 4.0 really means for a manufacturing plant — and seven practical benefits, from higher output to faster problem-solving and better customer service.

    2 min read

TT-99 Start a project

Got an obsolete PLC, a tired drive, or a new line to automate?

Start a work order. An engineer — not a call centre — reviews every enquiry and responds within one business day.

Technotude Automation

Work Order

WO-NEW

2026-11-19

03 · Requirement

Response within 1 business day