Skip to content
TT-03 Service module

SCADA & HMI Systems

Screens your operators actually understand.

PLATFORMS ▸ Siemens WinCC / TIA · FactoryTalk · Web panels

LINE-01 · PROCESS OVERVIEW ONLINE TK-101 M-01 · 1480 rpm VFD-1 42.6 Hz VFD-2 38.1 Hz LINE SPEED · m/min MOTOR LOAD 72.4 % ALARMS 0 ACTIVE
  • 01Process mimics & operator screens
  • 02Alarm management & historical trends
  • 03Batch / recipe handling & reports
  • 0421 CFR Part 11 audit trail for pharma

01 Overview

A good HMI or SCADA system shows operators exactly what they need, when they need it — and gives managers the data to improve. We design operator interfaces around how your plant really runs: clear process mimics, meaningful alarms, trends and reports.

From a single machine HMI to plant-wide SCADA with historian, recipe management and remote access, we build systems that are intuitive on the shop floor and compliant where regulation demands it, including 21 CFR Part 11 audit trails for pharmaceutical plants.

  • 24×7 Visibility of plant status

  • Part 11 Audit-trail ready for pharma

  • Reports Automated shift & batch reports

02 Scope of supply

What's included

Every element is delivered, tested and documented by the same team.

  1. TT-03.01

    Process mimics

    Clean, high-performance screen design with consistent navigation and status colours.

  2. TT-03.02

    Alarm management

    Prioritised, acknowledged and logged alarms that reduce nuisance trips and operator overload.

  3. TT-03.03

    Trends & historian

    Real-time and historical trending of process values for analysis and troubleshooting.

  4. TT-03.04

    Batch & recipe handling

    Recipe management, batch records and automated shift/production reports.

  5. TT-03.05

    Compliance

    User management, electronic signatures and audit trails for GMP / 21 CFR Part 11.

  6. TT-03.06

    Remote access

    Secure remote monitoring and web panels for supervisors and support engineers.

03 Applied in

Industries where we apply this

Process knowledge matters as much as the technology — these are the sectors where this service is most in demand.

FAQ Answers

Frequently asked questions

Can't find your answer? Ask an engineer →

What is the difference between HMI and SCADA?

An HMI is usually a local operator panel for one machine. SCADA supervises a whole plant or several sites from a central system, with data logging, trends, reports and alarms across many controllers.

Can you add SCADA to our existing PLCs?

In most cases, yes. We connect to existing PLCs over their native protocols, then build screens, alarms and reports without disturbing the running control logic.

Do you support 21 CFR Part 11 compliance?

Yes. We implement user access levels, electronic records, audit trails and electronic signatures required for pharmaceutical GMP environments.

TT-99 Start a project

Got an obsolete PLC, a tired drive, or a new line to automate?

Start a work order. An engineer — not a call centre — reviews every enquiry and responds within one business day.

Technotude Automation

Work Order

WO-NEW

2026-11-19

03 · Requirement

Response within 1 business day