Metalliser drive section — SIMOVERT Masterdrives to SINAMICS S120

The metalliser's ageing Siemens SIMOVERT Masterdrives line-up replaced with a modern Siemens SINAMICS S120 multi-axis drive system.

OLD SYSTEM

Siemens SIMOVERT Masterdrives

NEW SYSTEM

Siemens SINAMICS S120

technotude AUTOMATION PVT. LTD.
DOC NO.
TT-CS-02
MACHINE
Metalliser Machine
SECTION
Drive section
INDUSTRY
Polyfilms & packaging
DRAWN
TECHNOTUDE AUTOMATION
REV / SHEET
A · 1 OF 1
BEFORE

Siemens SIMOVERT Masterdrives

  • Discontinued SIMOVERT Masterdrives line-up
  • Units showing fault codes and heavy contamination
  • Increasing difficulty sourcing spares and repairs
AFTER

Siemens SINAMICS S120

  • Modular SINAMICS S120 multi-axis drive system
  • Clean, re-engineered drive cabinet
  • Modern diagnostics and commissioning tools

The challenge

The metalliser’s web-handling motors were driven by a Siemens SIMOVERT Masterdrives line-up — a drive family that has been discontinued. The units were heavily contaminated and showing fault codes, and sourcing replacements or repairs was becoming increasingly difficult. On a metalliser, a drive failure stops the whole vacuum process.

Our solution

We replaced the obsolete line-up with a Siemens SINAMICS S120 modular drive system:

  • Assessed the existing motors, loads and drive configuration.
  • Engineered and sized a SINAMICS S120 multi-axis system for the machine’s sections.
  • Re-engineered the drive cabinet and installed the new line-up.
  • Commissioned and tuned each axis and integrated the drives with the machine control.

The result

The metalliser’s drive section now runs on a current, supported Siemens platform with modern diagnostics — removing a major obsolescence risk from a critical production asset.

TT-99 Start a project

Got an obsolete PLC, a tired drive, or a new line to automate?