Skip to content

Case study · Retrofit report

Metalliser boat heating — obsolete thyristors to Eurotherm EPack

Obsolete Eurotherm and mixed-OEM thyristor units in the metalliser's boat-heating section replaced with new Eurotherm EPack power controllers.

OLD SYSTEM

Obsolete Eurotherm thyristors · other OEM makes

NEW SYSTEM

Eurotherm EPack thyristors

technotude AUTOMATION PVT. LTD.
DOC NO.
TT-CS-03
MACHINE
Metalliser Machine
SECTION
Boat heating section
INDUSTRY
Polyfilms & packaging
DRAWN
TECHNOTUDE AUTOMATION
REV / SHEET
A · 1 OF 1
BEFORE

Obsolete Eurotherm thyristors · other OEM makes

  • Obsolete Eurotherm thyristor units
  • Mixed thyristor makes from different OEMs
  • Difficult maintenance and spares management
AFTER

Eurotherm EPack thyristors

  • New Eurotherm EPack power controllers
  • Standardised on a single, supported platform
  • Neater panel layout and simpler maintenance

The challenge

In a metalliser, the evaporation boats are resistively heated to melt and evaporate aluminium wire. Stable, precise power control is essential for uniform metallisation. This machine’s boat-heating section relied on obsolete Eurotherm thyristors mixed with units from other OEMs — making spares management and maintenance difficult.

Our solution

We standardised the section on current-generation Eurotherm EPack power controllers:

  • Surveyed the heating circuits and existing thyristor units.
  • Selected EPack controllers and engineered the revised panel layout.
  • Replaced and re-wired the power controllers.
  • Configured, tested and commissioned each heating channel.

The result

The boat-heating section now runs on a single, supported thyristor platform — simplifying maintenance and spares while keeping the precise power control the process needs.

TT-99 Start a project

Got an obsolete PLC, a tired drive, or a new line to automate?

Start a work order. An engineer — not a call centre — reviews every enquiry and responds within one business day.

Technotude Automation

Work Order

WO-NEW

2026-11-19

03 · Requirement

Response within 1 business day